
AL MAARID bay project was carried out in Rasal kheymeh- UAE during 2005 to 2006 ,it was reclamation and beach nourishment project .we cooperated in the first phase as subcontractor.
The main specification of job were as below
• Location : RAK – UAE
• Clinet : RAK Dredging
• Consoultant: Halcrow
• Main contractor :Multi Group
• Subcontractor : Kariz co
• Total Dredged Volume : 1,000,000
• Utilized Dredger : Kargar – CSD