
Karoon River is Iran’s most polluted and the only navigatable river. Moshiran Kariz engaged in the project in 2007 and finnished it in 2009. The main purposes of dredging were flood control and improvement in the navigation in the river.
The main Specifications of this project were as below:
• Location: Ahwaz-Iran
• Client: Khuzestan water and power Org.
• Consultant: Sazeh Pardazi Co.
• Contractor: Moshiran Kariz Dredging JV
• Volume: 3,500,000 m3
• Utilized dredgers: IHC Beaver 3800 & IHC Beaver 1200